Description
Trains entering the staging yard are automatically routed to the first free track. If a siding is free, HADES switches the corresponding turnout. A short section of the stabling track is de-energised in front of the exit switch. As soon as the integrated track occupancy detector detects a power consumer, the entry point is set and the section after the entry point is de-energised. The train stops regardless of whether the locomotive is pulling or pushing.
The basic module monitors and controls the first two stabling tracks. An additional track module monitors and controls 2 further stabling tracks (max. 15 track modules can be connected).
In the event of a fault, the LEDs flash and the exit of further trains is blocked. If only the track voltage has failed, the operation continues with the last settings after switching on again.